Contract Win: Shelley House, Suffolk đźŹ
29th July 2025
We’re delighted to share that LP Energy Associates has been appointed to deliver specialist energy and building services consultancy for the major refurbishment of a listed heritage dwelling in Suffolk.
This exciting project involves extensive internal upgrades and the conversion of existing outbuildings for residential use – all within the constraints of a sensitive, historic site.
Our role includes developing a bespoke energy upgrade strategy, replacing the existing oil-based system with a future-proofed, off-grid heat pump solution to provide efficient heating and hot water.
Our scope of work includes:
📌 Site Survey to build existing model
📌 Energy Model showing heat losses, heating, and cooling loads
📌 Energy upgrade modelling – showing costs, paybacks, and EPC rating
📌 Stakeholder coordination throughout the design phase
Careful planning will be essential due to high heat loss and heritage restrictions, but our approach ensures the best balance between conservation and energy performance. We’re proud to play a key role in creating a more sustainable future for historic properties.
Contract Win: Pamona Wharf, Manchester 🏢
29th July 2025
We’re thrilled to announce that LP Energy have been appointed by Workman Group to deliver energy performance consultancy for the Pamona Wharf residential block in Manchester.
This exciting project focuses on future-proofing an existing residential development through a detailed NZAP modelling exercise and a clear roadmap to achieving EPC B compliance, all while reducing energy and carbon intensity across the site.
Our scope includes:
📌 EPC assessment and compliance review
📌 Decarbonisation modelling
📌 Thermal comfort modelling
This project highlights LP Energy’s commitment to practical energy solutions for existing residential schemes. We’re proud to help deliver low-carbon, energy-efficient outcomes that support the UK’s sustainability goals.
Employee Spotlight: Lee Pasifull – Managing Director
29th July 2025
Meet Lee Pasifull, the Managing Director of LP Energy Associates. We caught up with Lee to discover more about his role, his passion for the industry, and how he likes to unwind when he’s off the clock.
🗨️ When did you establish LP Energy, and how has the journey been so far?
“LP Energy was established in January 2022, starting out from my spare room. Since then, we have grown into a well-established consultancy, with a diverse and multiskilled team of consultants. The journey so far has been positive. We work on some amazing and interesting projects and have built a great team. At times, it can be stressful, but extremely rewarding.”
🗨️ What’s the most rewarding part of your role as Managing Director?
“Being able to work alongside my team on some fantastic and rewarding schemes. From single residential dwellings, to full portfolios of building stock. Additionally, it is gratifying to offer training and support and to watch the team grow their confidence and skill sets. Finally, I love working with repeat clients that I have had the pleasure to form friendly and longstanding professional relationships with.”
🗨️ Where do you envision LP Energy and yourself in the next 5 years?
“We are now in year 4 and have seen substantial growth of our team and services. The next five years, I would like to see our team double in size and push our knowledge and expertise to the point of providing a full, diverse range of ESG services, internationally.”
🗨️ What do you believe is the key to your team’s success?
“Flexibility and allowing the team to take responsibility for their own projects and clients. My method of working is to avoid micromanaging where possible. I also believe that having a team that continuously learn and adapts is key to their success, to which I am very proud”
🗨️ How do you like to unwind after work?
“I am a musician and enjoy performing weekly around pubs, clubs and festivals. When I am not doing that, I enjoy cycling and spending time hiking with my partner and our dog, Elvis.”
🗨️ If you could give your younger self one piece of advice, what would it be?
“Don’t let indecisiveness and fear hold you back from opportunities laid out in front of you. Also, don’t work yourself to the point of burnout”
🗨️ What are the top three items on your bucket list?
“Travel to every country in the world, get another miniature Schnauzer and open a vineyard”.
🗨️ What’s your biggest pet peeve?
“Traffic is up there with my biggest pet peeve.”
🗨️ What is your go-to karaoke song?
“Thanks to the band, I have about 125 of them.”
🗨️ If you hosted a talk show and could invite any three guests, who would you choose?
“Brian Cox, Will Ferrell and Steven Tyler (Aerosmith)”
Project Complete – Level 9, The Shard ✅🏢
15th July 2025
We’re proud to announce the successful delivery of a standout office fit-out at one of London’s most iconic and sustainability-driven landmarks – The Shard, for Workplace Creations.
Appointed at the close of last year, LP Energy played a supporting role in this high-profile transformation, ensuring the space met the highest standards of functionality, design, and environmental performance.
From the outset, our team collaborated closely with the building’s existing systems to craft a tailored solution that aligned seamlessly with the client’s vision. Being such an iconic landmark building, careful integration with the existing building services was crucial. The project proudly achieved an EPC B rating, reflecting our unwavering commitment to sustainability and energy efficiency.
A huge thank you to everyone who contributed to making this project a success. We’re excited to keep pushing boundaries and look forward to sharing more milestones soon! 👏
Project Completion at George Street, London 🏢
1st July 2025
We are thrilled to announce the completion of the project at George Street, London.
Appointed by Summertime Developments, we delivered energy and building services consultancy for the redevelopment of a historic building, formerly occupied by House of Fraser, comprising approximately 62,000 sq ft of new commercial office space and 39,000 sq ft of prime retail space.
Working within the constraints of a sensitive heritage site, we overcame significant challenges through innovative design and meticulous coordination, ensuring the building’s character was preserved while meeting modern standards.
The scheme is fully electric, incorporating advanced heat pump technology to provide a future-proof, energy-efficient solution. With A/B-rated EPCs, the development is not only sustainable and cost-effective but also ready for immediate tenant occupation, blending historic charm with cutting-edge performance. ♻️
A huge well done to the team who made this project come to life. We look forward to sharing updates on our upcoming projects soon! 👏
Project Update – Office Floorplate, The Shard 🏢
16th June 2025
We’re excited to share progress on one of our most prestigious commercial sustainability projects to date. In December last year, LP Energy was appointed to support the transformative fit-out of an office floorplate at The Shard, one of London’s most iconic and energy-conscious skyscrapers
This high-specification office refurbishment has been designed to meet the existing sustainability, energy efficiency, and performance goals, all while aligning with the needs of the building’s tenants and owners.
From the start, LP Energy’s role was maintaining key environmental certifications, ensuring the space delivered both on functionality and future-proofed design
Services Provided:
🔎 Pre-EPC assessment
đź“„ EPC compliance works
🌱 BREEAM performance review
♻️ Ongoing sustainability & regulatory consultancy
We look forward to sharing updates as we help this iconic building reach its sustainability and performance goals.
Project Completion – Beeches Farm 🌾
30th May 2025
LP Energy is proud to announce the successful completion of a transformative refurbishment project at Beeches Farm, Rayleigh – converting a traditional barn into a stunning high-end residential dwelling.
The project commenced in January 2023 and successfully reached completion this month. This ambitious undertaking involved the full-scale revitalisation of a historic barn, seamlessly blending its original charm with cutting-edge sustainability and contemporary design 🏡
Project highlights include:
▪️ A comprehensive refurbishment focused on environmental performance
▪️ Excellent building fabric, utilising high levels of insulation and thermal bridging remediation
▪️ The use of responsibly sourced materials throughout
▪️ Integration of advanced technologies such as air source heat pumps, whole house ventilation and solar panels
▪️Achievement of an ‘A’ EPC rating through sustainable construction practices and innovative design
Services Provided:
▪️ Air pressure testing
▪️ MEP design
▪️ EPC works
▪️ SAP and Part L 2021 compliance
▪️ Overheating study
▪️ Whole life carbon study
This development is a true celebration of the barn’s historic character, fused with modern innovation – an inspiring example of what sustainable luxury can look like. we would like to thank our client for their future-proofed and sustainable vision in this project.
LP Energy Associates now offer Air Testing!
21st November 2024
LP Energy Associates now offer full air testing, for residential and commercial properties. Please get in touch with us now to discuss how we can improve your buildings performance.