Assets – Leicester

Canmoor
  • Client: Canmoor
  • Date: 2024
  • Services: Energy Upgrade, Operational (NABERS), EPC Works

LPEA worked as energy consultants to provide EPC upgrade solutions, with costs, carbon and energy improvements and future proofing solutions. Where the building was originally at risk of becoming a stranded asset, the design ensures a B rated EPC and improved tenant conditions within the building

163-203 Eversholt Street, London

Ambit Moat
  • Client: Ambit Moat
  • Date: 2024
  • Services: Energy Upgrade, Operational (NABERS), EPC Works, SKA Fit Out Rating, Whole Life Carbon

LPEA carried out several innovative, sustainable specialisms for a large office refurbishment, in Central London. The client demanded exceptional sustainable standards, which ensured a SKA Gold Rating, NABERS 4.5-star proposal and low WLC measures. This includes 95% recycled content from site activities, to obtain the highest level of sustainable and future proofed certifications and standards.

Fairfield House

PML
  • Client: PML
  • Date: 2024
  • Services: SAP - EPC - Overheating

Appointed to carry out SAP assessment, Part O overheating and Whole Life Carbon study on 20 apartment scheme in London. LPEA provided the design team with regular energy and sustainability guidance, including planning condition discharge, U- value guidance and future proofing solutions

Elsenham

Vistry
  • Client: Vistry
  • Date: 2023 - Present
  • Services: Part O and TM59 Modelling

Appointed to carry out overheating studies on 131 residential Appointed to act as main energy consultant for 9 no. apartments dwellings. The site included noise sensitive areas, with restricted in Essex. The planning conditions called for several sustainable window openings adjacent to an A road. interventions, including car charging and 10% of energy use being produced via renewable technology. After carrying out Part O studies, LPEA produced a TM59 dynamic model for house types and advised the client on routes to LPEA worked with the design team to adopt the new Building compliance with AD Part O.

Viney Bridge Mill

FLD
  • Client: FLD
  • Date: 2023 - Present
  • Services: SAP - Part O - Energy Auditing - Listed Building

Appointed to carry out energy upgrade reporting on a housing scheme in Biggin Hill As part of the scope, LPEA created a customizable upgrade tool to allow clients to review and value engineer EPC upgrade options.

Wildfowlers

RSMEP
  • Client: RSMEP
  • Date: 2023
  • Services: SAP - EPC - Heat Loss and Overheating

Appointed to carry out energy upgrade reporting on a housing scheme in Biggin Hill As part of the scope, LPEA created a customizable upgrade tool to allow clients to review and value engineer EPC upgrade options.

Lower Road

SLA Architects
  • Client: SLA Architects
  • Date: 2022 - Present
  • Services: SAP - EPC - Thermal Bridging - Whole Life Carbon

Appointed to act as main energy consultant for 9 no. apartments Appointed to act as main energy consultant for 9 no. apartments in Essex. The planning conditions called for several sustainable in Essex. The planning conditions called for several sustainable interventions, including car charging and 10% of energy use being interventions, including car charging and 10% of energy use being produced via renewable technology. produced via renewable technology. LPEA worked with the design team to adopt the new Building LPEA worked with the design team to adopt the new Building Regulations.

Biggin Hill

Annington Group
  • Client: Annington Group
  • Date: 2022
  • Services: SAP – EPC – Energy Auditing

Appointed to carry out energy upgrade reporting on a housing scheme in Biggin Hill As part of the scope, LPEA created a customizable upgrade tool to allow clients to review and value engineer EPC upgrade options.